Back Home |
Malletts
Bay Boat Club
|
==============================================================================================Rebuild Harbor Whaler Console |
4/1/2015 |
Day and Time | Task (click for details) | Support Personnel |
==============================================================================================Second Day |
5/6/2015 |
testing |
Day and Time | Task (click for details) | Support Personnel |
Saturday 1000-1100 | test | Volunteer Needed |
==============================================================================================Opening Day Task List |
5/9/2015 |
Subject to change based on main dock repairs. |
Day and Time | Task (click for details) | Support Personnel |
Saturday 0901-0930 | Reposition Main Dock | Jeff Tobrocke |
Saturday 0901-0930 | Reposition Main Dock | Volunteer Needed |
Saturday 0901-0930 | Reposition Main Dock | Volunteer Needed |
Saturday 0930-1000 | Move dinghy dock to summer position | Jeff Tobrocke |
Saturday 0930-1000 | Move dinghy dock to summer position | Jon Ewing |
Saturday 0930-1000 | Move dinghy dock to summer position | David Groening |
Saturday 1000-1030 | Install ramp for dinghy dock (heavy lifting) | Jeff Tobrocke |
Saturday 1000-1030 | Install ramp for dinghy dock (heavy lifting) | David Groening |
Saturday 1000-1030 | Install ramp for dinghy dock (heavy lifting) | Volunteer Needed |
Saturday 1000-1030 | Install ramp for dinghy dock (heavy lifting) | Volunteer Needed |
Saturday 0900-0930 | Recommission Pumpout w/ Rick Ritter | Angelo Caserta |
Saturday 0900-0930 | Recommission Pumpout w/ Rick Ritter | Thomas Moreau |
Saturday 0830-0900 | Recommission Water lines on Main dock, Work Dock. | Volunteer Needed |
Saturday 0830-0900 | Recommission Water lines on Main dock, Work Dock. | Thomas Moreau |
Saturday 0915 | Reposition FJ Racks for Summer | Volunteer Needed |
Saturday 0915 | Reposition FJ Racks for Summer | Volunteer Needed |
Saturday 0915 | Reposition FJ Racks for Summer | Volunteer Needed |
Saturday 0915 | Reposition FJ Racks for Summer | Jon Ewing |
Saturday 1000 | Recommission the Zodiac | Volunteer Needed |
Saturday 1000 | Recommission the Zodiac | Volunteer Needed |
Saturday 1015 | Recommission (polish) the Launches | Alden Bryan |
Saturday 1015 | Recommission (polish) the Launches | Don Duquette |
Saturday 1015 | Recommission (polish) the Launches | Carol Groening |
Saturday 1020 | Recommission Race Whaler | Volunteer Needed |
Saturday 1020 | Recommission Race Whaler | Volunteer Needed |
Saturday 1010 | Recommission 4 Club Dinghies (Need to wash and mark them) | Volunteer Needed |
Saturday 0900-1000 | Recommission Dockhouse, Switch to GFCI powerbox and lockout winter box. | Lew Wetzel |
Saturday 0900-1000 | Recommission Dockhouse, Switch to GFCI powerbox and lockout winter box. | Randy Whitney |
Saturday 1100 | Hoist Safety Demonstration - Record the video. | Volunteer Needed |
Saturday 0901-0930 | Reposition Main Dock | Volunteer Needed |
==============================================================================================Prepare to Close Main Dock |
9/20/2015 |
Day and Time | Task (click for details) | Support Personnel |
Sun 1700 | Relocate spare dock to East side of Work Dock | Volunteer Needed |
Sun 1730 | Move launches, whalers, punt to spare dock | Volunteer Needed |
Sun 1715 | Relocate 4 club dinghies to spare dock | Volunteer Needed |
Sun 1710 | Install stairs or ramp for relocated spare dock | Volunteer Needed |
Sun 1715 | Strap/Secure all barrel floats for spare dock | Volunteer Needed |
Sun 1720 | Replace any bad planks on spare dock | Volunteer Needed |
Sun 1740 | Relocate plastic dinghy dock | Volunteer Needed |
Sun 1800 | Close Main Dock | Volunteer Needed |
==============================================================================================Assist Welding Crew |
9/21/2015 |
Day and Time | Task (click for details) | Support Personnel |
==============================================================================================Assist Welding Crew |
9/23/2015 |
Day and Time | Task (click for details) | Support Personnel |
Wed 0900 | Assist Welding Crew with re-installation of 4x4 box | Volunteer Needed |
Wed 0900 | Move welding equipment | Volunteer Needed |
==============================================================================================Re-open Main Dock |
9/26/2015 |
Reverse the closing procedure. |
Day and Time | Task (click for details) | Support Personnel |
Sat 0800 | Relocate launches, whalers, club dinghies to main dock | Mark Baglini |
Sat 0815 | Reattach plastic dinghy dock to main dock | Volunteer Needed |
Sat 0830 | Relocate spare dock back to W side of work dock | Volunteer Needed |
Sat 0900 | Re-open Main Dock | Volunteer Needed |
==============================================================================================Club Closing |
10/17/2015 |
Day and Time | Task (click for details) | Support Personnel |
Sat 0900 | Move Swim Dock to Winter Position | Volunteer Needed |
Sat 0900-0910 | Move Plastic Dinghy Dock to Winter Position | Volunteer Needed |
Sat 0900-0930 | Remove and Store Wooden Dinghy Dock Ramps (See Dave Groenig) | Volunteer Needed |
Sat 0900-0930 | Remove and Store Wooden Dinghy Dock Ramps | Volunteer Needed |
Sat 0900-0930 | Remove and Store Wooden Dinghy Dock Ramps | Volunteer Needed |
Sat 0900-0930 | Remove and Store Wooden Dinghy Dock Ramps | Volunteer Needed |
Sat 0900-0930 | Prep Pumpout for Winterization (See Rick Ritter) | Volunteer Needed |
Sat 0900-0930 | Prep Pumpout for Winterization | Volunteer Needed |
Sat 1000-1100 | Winterize the Pumpout, Work Dock, Main Dock Water Lines (See Rick Ritter) | Volunteer Needed |
Sat 1000-1100 | Winterize the Pumpout, Work Dock, Main Dock Water Lines (See Rick Ritter) | Volunteer Needed |
Sat 0900-0915 | Reposition FJ Racks for Winter | Volunteer Needed |
Sat 0900-0915 | Reposition FJ Racks for Winter | Volunteer Needed |
Sat 0900-0915 | Reposition FJ Racks for Winter | Volunteer Needed |
Sat 0900-0915 | Reposition FJ Racks for Winter | Volunteer Needed |
Sat 0900-0945 | Decommission the Zodiac (See Steve Crane) | Volunteer Needed |
Sat 0900-0930 | Decommission the Zodiac (See Steve Crane) | Volunteer Needed |
Sat 0900-0945 | Decommission the Harbor Whaler (See Steve Crane) | Volunteer Needed |
Sat 0900-0950 | Decommission the 13.3 Whaler (See Steve Crane) | Volunteer Needed |
Sat 0900-0946 | Decommission one of the Launches (See Steve Crane) | Volunteer Needed |
Sat 0900-1000 | Decommission Dockhouse, Switch from GFCI to winter panel. (Lew Wetzel) | Volunteer Needed |
Sat 0900-1000 | Decommission Dockhouse, Switch from GFCI to winter panel. (Lew Wetzel) | Volunteer Needed |
Sat 0900-0946 | Decommission one of the Launches (See Steve Crane) | Volunteer Needed |
Sat 0900-0950 | Decommission the 13.3 Whaler (See Steve Crane) | Volunteer Needed |
Sat 0900-0945 | Decommission the Zodiac (See Steve Crane) | Volunteer Needed |
Sat 0900-0945 | Decommission the Harbor Whaler (See Steve Crane) | Volunteer Needed |
==============================================================================================Club Closing |
10/22/2016 |
Day and Time | Task (click for details) | Support Personnel |
Saturday 09:00 | Move Dinghy Docks to Winter Position (See Steve Crane) | Michael Moran |
Saturday 09:10 | Remove ramps for 598 dinghy dock (See Dave Groenig) | Volunteer Needed |
Saturday 09:30 | Decommission Pumpout (See Rick Ritter) | Thomas Moreau |
Saturday 09:45-11:00 | Decommission Water lines on Main dock, Work Dock. (See Rick Ritter) | Volunteer Needed |
Saturday 10:00 | Reposition FJ Racks for Winter | Volunteer Needed |
Saturday 10:30 | Decommission the Zodiac | Volunteer Needed |
Saturday 11:00 | Decommission the Harbor Whaler after Harbor is done with it. | Volunteer Needed |
Saturday 10:30 | Decommission Providence (See Steve Crane) | John Irving |
Saturday 10:30 | Decommission Mini Whaler | Volunteer Needed |
Saturday 10:00 | Decommission 4 Club Dinghies (Need to wash them, set up oars, PFDs) | Volunteer Needed |
Saturday 10:00 | Decommission Dockhouse, Install Winter Covers, Switch from GFCI powerbox and open winter box. | Volunteer Needed |
Saturday 10:45 | Survey Docks for Split/Bad Deck Planks and for Float Damage (Muskrats, etc) | Jeff & Elizabeth Deutsch Tobrocke |
Saturday 10:45 | Make note of any repairs or upgrades needed for any of the club boats. | Volunteer Needed |
Saturday 09:45-11:00 | Decomission Pumpout | Volunteer Needed |
Saturday 10:00 | Decommission Dockhouse | Volunteer Needed |
Saturday 10:10 | Reposition FJ Racks for Winter | Volunteer Needed |
|
|